Space Index

Project Hilal — Artemis Landing

As of 03 March 2009. Target crew launch (IRP forecast): mid–late 2010

Return Khaldea to Artemis (Nirvali’s second moon) under Plan 2010 / Artemis 2010.

On this page


Architecture — Earth Orbit Rendezvous

Karshan-K9 cannot lift full Apollo-style stack. Two launches:

  1. K9: Sancak lunar lander + Lunar Transfer Stage (LTS) → LEO
  2. K4 (+2 days):Gökmen in Okçu capsule → dock to LTS/lander stack
  3. TLI burn → lunar orbit → powered descent (Sancak) → surface ops → ascent → rendezvous → re-entry (Septenez recovery)

**


Status (03 March 2009)

  • Factories (Ortemm) assembling flight hardware
  • Astronauts: 14 hr/day simulator syllabus
  • Sancak vacuum test: not yet flown — scheduled May 2009 (hard vacuum, descent engine throttle)

Mission dice (at launch IRP)

Four phases, each 2d100 when RP reaches launch:

PhaseChecks
1 — The StackDual launch + LEO rendezvous/dock
2 — TLI & lunar orbitTransfer burn + Saab-KADI navigation
3 — DescentSancak powered landing (15 min window)
4 — ReturnAscent, dock, re-entry

Launch Vehicles — Karshan · Kaizaran Orbital Station (KOS) · Strategic Projects (2009)