Strategic Projects & Force Development

As of 03 March 2009. Later milestones are indicated as projected where applicable.

On this page


Defence budget: ~4% GDP → **~BN224B / ~8.94T PPP ≈ BN5,588T).


Royal Khaldean Navy (RKN)

ProgrammeStatus (03 Mar 2009)Notes
Artezin Block III2 hulls doneArtezin & Zhafer (B3/SA) mid-2008; ~18 mo/hull from 2007. See Naval Fleet.
Muzhafit retirementActiveLER halted 2007; hulls to reserve, foreign transfer, or scrapping. Class total uncertain (~24–28 built); ~6–8 removed from frontline since 2007.
Vatan ASW frigateAcceleratingReplacing Muzhafit tasking on ASW/escort lines.
Saldirzhan SSN1-for-1 vs Akhra~20 months per boat at YDKK. 3 in commission; further retirements matched to deliveries.
Bekçi OPVBuild / trialsModular low-observable coastal patrol; first units in sea trials (projected IOC late 2009).
Kama FACBuild / trialsReplacing ageing 1980s FAC and patrol craft; littoral fast-attack complement.
Programme Yıldız (RKS Gelecek)R&D / constructionPublic name Yıldız for DDG(X) prototype; hydrodynamics complete at Ortemm Naval R&D (Military Shipyards, opened 01 Apr 2007). Keel laid 2006; fitting-out continues.
Ortemm superhubOperatingSteel mill + refinery + R&D → lower cost/slip time for prototypes and corvettes.

Doctrine fit: Septenez dominance, strait seizure, littoral swarm + subs vs peer (Yuktobania).
Industry: Industry and Infrastructure (Ortemm steel/silicone, Lirsentan/Mortek fuel).


Royal Khaldean Air Force (RKAF)

ProgrammeStatus (03 Mar 2009)Notes
JAS-39KBackbone~1,050 aircraft; dispersed ops / motorway basing.
JAS-39K2 “Kral Pençe”LRIP (headline)Q2 2007 flight → fix; LRIP Q4 2008. AESA/RM12-MAX/IRST. 6th FW. See Air Force Aviation.
J-37 ViggenRole changeInterceptor → CAS / battlefield air support where air superiority is assured; garrison & internal-security tasks. Imperial prestige (Emperor Lokrens III — former Viggen pilot).
J-35K DrakenPhase-outTrainers, weapons trials, range; <50 combat-relevant.
Project Boran (JAS 45)Prototype assemblySEPTECOM workshares; X-45 rollout forecast 2010.
Khaldean SiliconeRampingDomestic AESA/radar processors; eases K2 & smart munitions (mass production forecast mid-2009).

See Air Force Aviation.


Royal Khaldean Army (RKA)

ProgrammeStatus (03 Mar 2009)Notes
Kirpi APSSelective fieldingTechnology (not a vehicle). Q2 2006: 50 prototypes; ~620 Gökhan + ~740 Kurt only — see Armoured Fighting Vehicles.
Ardland export (DSZD)In progressContract Aug 2007 — see Exports - DSZD. STRV line essentially complete; STRF/HKP still delivering.
Surplus policyNo open exportBuild Imperial reserve & modernise; DSZD may advertise — buyer must be RP’d.

KUK / Space

Linked: Space Index.

ProgrammeStatus (03 Mar 2009)Notes
KOSInhabitedPermanent crew rotation via Karshan-K4 / Okçu.
Project HilalIntegrationHardware assembly Ortemm; crew simulators 14 hr/day.
Sancak lander vacuum testForecast May 2009Not yet occurred at this IRP date.
Crewed Artemis landingForecast mid–late 2010Four × 2d100 phases at mission date.

Decisions / RP hooks (Mar 2009)